Byty Kaskády Barrandov XI - cooperative

  • Choose floor
    1st floor
    2nd floor
    3rd floor
    4th floor
    5th floor
    6th floor
    7th floor
    8th floor
    9th floor
    10th floor
    11th floor
    12th floor
    13th floor
    14th floor
    15th floor
    16th floor
    17th floor
iYou have chosen Kaskády Barrandov XI
Kaskády Barrandov XIII
Kaskády Barrandov XI - cooperative
Kaskády Barrandov XII
  • Virtual model
  • Architecture
  • Neighborhood

We found 9 units

Cooperative flat 502/H
4+k
118,1 m2
Terrace (49,7 m2), Front garden (55,3 m2), GarageThe price of the garage parking place is not included in the total price of the apartment.
Kaskády Barrandov XI
5th floor
N, W
  • Construction started
iThe listed prices do not include the garage parking space, the parking space outside of the garage and, as the case may be, a utility room and a cellar.
 
467 243 €
Cooperative flat 904/H
4+k
119,8 m2
Balcony (10,6 m2), GarageThe price of the garage parking place is not included in the total price of the apartment.
Kaskády Barrandov XI
9th floor
E, N
  • Construction started
iThe listed prices do not include the garage parking space, the parking space outside of the garage and, as the case may be, a utility room and a cellar.
 
383 542 €
Cooperative flat 604/H
4+k
119,8 m2
Balcony (10,6 m2), GarageThe price of the garage parking place is not included in the total price of the apartment., Storage roomThe price of the utility room is not included in the total price of the apartment.
Kaskády Barrandov XI
6th floor
E, N
  • Construction started
iThe listed prices do not include the garage parking space, the parking space outside of the garage and, as the case may be, a utility room and a cellar.
 
380 155 €
Cooperative flat 108/H
3+k
102,4 m2
Terrace (78,8 m2), Front garden (94,1 m2), GarageThe price of the garage parking place is not included in the total price of the apartment.
Kaskády Barrandov XI
1st floor
E
  • Construction started
iThe listed prices do not include the garage parking space, the parking space outside of the garage and, as the case may be, a utility room and a cellar.
NTentative reserved
375 217 €
Cooperative flat 1202/H
3+k
103,3 m2
Terrace (18 m2), GarageThe price of the garage parking place is not included in the total price of the apartment., Storage roomThe price of the utility room is not included in the total price of the apartment.
Kaskády Barrandov XI
12th floor
E, N, W
  • Construction started
iThe listed prices do not include the garage parking space, the parking space outside of the garage and, as the case may be, a utility room and a cellar.
 
370 275 €
Cooperative flat 107/H
3+k
87,9 m2
Terrace (64,6 m2), Front garden (44,6 m2), GarageThe price of the garage parking place is not included in the total price of the apartment., Storage roomThe price of the utility room is not included in the total price of the apartment.
Kaskády Barrandov XI
1st floor
E
  • Construction started
iThe listed prices do not include the garage parking space, the parking space outside of the garage and, as the case may be, a utility room and a cellar.
NTentative reserved
327 606 €
Cooperative flat 105/H
3+k
83,9 m2
Terrace (48,4 m2), GarageThe price of the garage parking place is not included in the total price of the apartment.
Kaskády Barrandov XI
1st floor
E, N
  • Construction started
iThe listed prices do not include the garage parking space, the parking space outside of the garage and, as the case may be, a utility room and a cellar.
NTentative reserved
300 919 €
Cooperative flat 1403/H
2(1)+k
58,6 m2
Terrace (6 m2), GarageThe price of the garage parking place is not included in the total price of the apartment.
Kaskády Barrandov XI
14th floor
N, W
  • Construction started
iThe listed prices do not include the garage parking space, the parking space outside of the garage and, as the case may be, a utility room and a cellar.
NTentative reserved
202 811 €
Cooperative flat 1503/H
1+k
42,7 m2
Balcony (5,9 m2)
Kaskády Barrandov XI
15th floor
E, N
  • Construction started
iThe listed prices do not include the garage parking space, the parking space outside of the garage and, as the case may be, a utility room and a cellar.
NTentative reserved
175 233 €

We will help you to choose an apartment

Do you need help? Contact us, we are here for you.

About locality

The Prague’s Kaskády Barrandov an exceptional situation, because it is immediately connected to a unique countryside of the Prokopské valley. The place is interlaced with cycle tracks, forest roads and large green areas, which have been forming a popular destination for trips for many years. This locality offers rich public facilities, several shops and restaurants, as well as a modern health-centre within walking distance. Children will surely appreciate a beautiful waterpark full of relaxation zones and attractions, which is open all year round. Transportation to the city centre is provided by several tram routes with regular transport to Smíchov train station (13 min) and Václavské náměstí (Wenceslas Square) (24 min).

Barrandov is a young quarter, the history of which has started in the 1920’. We have this part of Prague thanks to Ing. Václav Havel (the father of our former president Václav Havel), who visited the Californian Berkley University and when he saw its beautiful quarter for rich Californians, he came to an idea to establish Barrandov.

At the start, he bought out lands with the total area of 55 hectares. Then, he changed the original name of this place, Habrová, which he considered to be insufficiently exclusive, to Barrandov after Joachim Barrand, a French scientist. His project was approved and the construction was started in 1927. The same year, Terasy, the most state-of-the-art restaurant in Czechoslovakia of that time, was opened.

Construction on the individual plots of Barrandov was left up to the owners and their taste. However, Ing. Havel reserved his right to inspect and consult the final plans with Max Urban, architect and the main designer of the project.

An impulse for construction of film studios in Barrandow was indirectly given by the Municipal Authority of the Prague in 1930. The company AB bought up approx. 50 hectares of land above the garden city and the first scenes were shot in Barrandov film studios at the end of 1931. In 1939, Germans confiscated Barandov film studios and started to make propagandistic films there.

In 1980’, a new housing estate was built near the film studios. The housing estate was built based on a project of G. Čelechovský to the west of the original housing development of Barrandov. The construction took place in the period 1981-1986. The housing estate is separated from the original Barrandov by a four-lane road, K Barrandovu Street, which follows-up to the Barrandov Bridge.

Several other apartment buildings, car parking buildings and outdoor and indoor swimming pool have been built in this locality starting from 1990’. Since 2003, a tram line leads to Barrandov from Hlubočepy.

...

Write a message

Please, leave your contact details below so that we can contact you.

We process your personal data in compliance with the GDPR